Information for Quantity Produced
#1


Hi all,




I was looking to make some minor edits to my version of <abbr title="Colonial Charter">CC</abbr>. What I wanted to do was to change the quantity produced or required for manufactured goods.




For example, the relevant part of the .rsc file for the Bedding Maker:




<div class="ipsSpoiler_header">
Spoiler




 



Code:
[ConsumeProduce] => Array
        (
            [products] => Array
                (
                    [0] => Array
                        (
                            [0] => ConsumeRawMaterial _consumeMaterials
[
{
ComponentDescription _material = "Template/RawMaterialFeather.rsc"
                            [1] => int _count = 25
                        )

                    [1] => Array
                        (
                            [0] => ComponentDescription _material = "Template/RawMaterialCloth.rsc"
                            [1] => int _count = 5
                            [2] => }
]
ComponentDescription _produceMaterial = "Template/RawMaterialBedding.rsc"
                            [3] => ResourceLimit _resourceLimit = Custom2
                            [4] => String _requirements = "BeddingFeatherRequire"
                        )
// ...
// ...
// ...

            [stringTable] => UI/ColonialStringTable.rsc
            [workRequired] => 10
            [toolType] => Hoe
            [workTime] => 8
        )


</div>


So I see here lines which specify that 25 feathers and 5 cloth are consumed. I also see that 10 "work" is required and 8 "time" is required. I cannot however see the amount of bedding produced (which I believe is 1 [see here]) anywhere in the file. My guess is that 1. the output quantity is somehow calculated from resource weight, the [workRequired] and [workTime] properties OR 2. it is specified elsewhere.




If case 1.



  1. I can edit these three quantities, say make bedding require 1 cloth and 4 feathers. The cost of cloth is 8 and feathers are 1, so this would result in a trade surplus per time of 0.15.

  2. How is this actually calculated? I can't seem to tell from looking at other buildings. I would prefer to tinker with the balance by changing the output qty directly.

If case 2.




Where is it specified?




General:




What does [workRequired] and [workTime] actually relate to? Does [workTime] convert to seconds? Something?




Thanks for you time, and sorry if this in the wrong section.


  Reply


Messages In This Thread
Information for Quantity Produced - by WetLettuce - 07-11-2019, 01:10 AM
Information for Quantity Produced - by Kralyerg - 07-11-2019, 03:55 PM
Information for Quantity Produced - by WetLettuce - 07-11-2019, 04:30 PM
Information for Quantity Produced - by WetLettuce - 07-17-2019, 10:58 AM
Information for Quantity Produced - by Kralyerg - 07-17-2019, 08:28 PM